

Osvitoria Hub
Customer: UDP
Design: AVG
Location: Ukraine, Kyiv, street Moscow, Arsenal plant.
Area: 980 m2.
Completion of construction: 2019
Section: electrical solutions (ETS), working documentation (WD).
A working project of power supply of a modern educational hub on the territory of the Arsenal plant known to Kyiv has been completed.
Lighting networks are made openly in black pipes on vaulted ceilings and walls. Lighting control, depending on the area, is performed on the Dali system (conference room), motion and light sensors (rooms without permanent presence of people).
Power grids are made in a specialized solution of Bettermann trays for masonry in the thickness of the floor. The difference in the level of the base was between different rooms up to 20 cm. Trays and long boxes were placed on pins and transferred to further work on the filling after surveying.
The switchboard equipment is developed and assembled on the basis of Schneider Electric products.
(Photo from Osvitoria )